Sunoco Refinery – Toledo, Ohio

BOC Gases – 110 MMSCFD Hydrogen Plant

Mechanical & Construction Manager / General Contractor:

Meccon self performed the piping, boilermaker, structural steel & millwright work; managed the electrical / instrumentation, foundation, underground utilities, excavation / backfill work; and bid / contracted / managed the painting & insulation work.

This plant includes:

  • two (2) Selas Hydrogen Reformers
  • Linde SMR-PSA Unit
  • Linde ROG-PSA Unit
  • two (2) Hydrogenation Process Units
  • four (4) Modular Hydrogen Compressor Units
  • four (4) Process Air Coolers
  • Pipe Racks & Pipe Rack Modules
  • 2,500 Pipe Spools
  • Water Treatment Unit
  • Power Distribution Center amp; Control/Office Buildings