Husky Refinery – Lima, Ohio

Linde Engineering North America
Lima 3 - 25 MMSCFD Hydrogen Plant

Mechanical, Structural & General Contractor

Meccon self-performed the Piping Erection, Furnace/Ductwork Erection, Onsite Equipment Receiving, Onsite Material Handling and Offsite Warehousing scopes of work; subcontracted & managed the Steel Erection, Crane Services, Pipe Spool Fabrication, Millwright, Refractory Insulation, Scaffolding, Piping/Equipment Insulation, Painting, NDE, Survey, Heat Treating and Structural Steel & Equipment Grouting scopes of work. This plant includes one (1) Linde/Selas Hydrogen Reformer/Waste Heat Recovery, Linde SMR-PSA Unit, 1,436+ Pipe Spools including High Alloy Pipe Welding (ie: Manaurite 900, Incoloy 800HT, 321SS), one (1) Process Gas Air Cooler, Syn-Gas Process Unit (11 modules), four (4) Pipe Racks (19 modules), two (2) Boiler Feedwater Pumps, two (2) Hydrogen Compressors, one (1) Nitrogen Compressor, one (1) Power Distribution Center Building and over sixty (60) Engineered Critical Lift Plans/Critical Lifts. The Lima 3 Hydrogen Plant Project was constructed adjacent to the Lima 2 Hydrogen Plant with the PR02 Connecting Piperack constructed South to North through the operating Lima 2 Plant.

This project included 300,000+ man-Hours without a single OSHA Recordable Injury.