Environmental

Meccon's experience constructing wastewater treatment and water purification facilities is extensive. The following is a list of facilities and systems successfully constructed:
Wastewater Treatment Facilities:
| |
■ |
New primary clarifier. |
| |
■ |
New aeration basin. |
| |
■ |
Retrofit existing aeration basin with new aeration equipment. |
| |
■ |
New bar screen and grit removal equipment. |
| |
■ |
New aeration systems including, blowers, controls, stainless steel piping and aeration bubbling equipment. |
| |
■ |
Chemical feed system. |
| |
■ |
New polymer mixing tanks and chemical feed system. |
| |
■ |
Replacement of raw water pumps and piping system modifications. |
| |
■ |
Installation of a new digester. |
| |
■ |
Modifications to and existing digesters. |
| |
■ |
1.5 MW co-generation facility (fueled by digester gas). |
| |
■ |
Grit removal system. |
| |
■ |
Aeration system upgrades. |
| |
■ |
Raw water pump station modifications. |
| |
■ |
Digester modifications. |
| |
■ |
Primary clarifier modifications. |
| |
■ |
Belt press installation and modifications. |
|
|
Primary Water Pumping Facilities:

| |
■ |
Primary electric equipment building. |
| |
■ |
Installation of new electrical switchgear and variable frequency drive equipment. |
| |
■ |
Removal, reconditioning and replacement primary water pumps (1250 to 2500 hp)
Installation of 2MW emergency diesel generators. |
| |
■ |
Demolition of existing steam boilers and associated sysgtems. |
|
|
Plant Energy Improvements and Co-Generation Systems:
| |
■ |
12kva electrical power system plant upgrades. |
| |
■ |
Installation of a new 6MW steam back pressure turbine/generator. |
| |
■ |
Installation of new 2 MW emergency diesel generators. |
| |
■ |
Installation of new energy management/metering systems. |
|
|
For more information, fill out our inquiry form. |